• New
AS/NZS 5139:2019
search
  • AS/NZS 5139:2019

AS/NZS 5139:2019

$371.45

AS/NZS 5139:2019 Electrical installations - Safety of battery systems for use with power conversion equipment

Quantity

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

AS NZS 5139 2019 specifies requirements for general installation and safety requirements for battery energy storage systems (BESSs), where the battery system is installed in a location, such as a dedicated enclosure or room, and is connected with power conversion equipment (PCE) to supply electric power to other parts of an electrical installation.

R00000531
1787 Items
chat Comments (0)
No customer reviews for the moment.