- -78%
- New
AS 5092-2009 CNG refuelling stations
(edit with the Customer Reassurance module)
(edit with the Customer Reassurance module)
(edit with the Customer Reassurance module)
Specifies requirements for the design, construction, operation and maintenance of compressed natural gas (CNG) refuelling stations which can be one of the following: (a) fast fill, where vehicles are filled in a period of minutes, analogous to liquid refuelling; (b) time fill, where one or (in most cases) a number of vehicles are filled simultaneously over a period of some hours; or (c) a combination of fast fill and time fill.