1-AS/NZS 2201.5:2008 INTRUDER ALARM SYSTEMS - ALARM TRANSMISSION SYSTEMS
4-PREFACE
5-CONTENTS
6-SECTION 1 SCOPE AND GENERAL
6-1.1 SCOPE
6-1.2 REFERENCED DOCUMENTS
6-1.3 DEFINITIONS
6-1.3.1 Aggregate path classification
6-1.3.2 Alarm transmission equipment
6-1.3.3 Alarm transmission system
7-1.3.4 Alarm transmission system interface
7-1.3.5 Availability
7-1.3.6 Communications path
7-1.3.7 Final alarm receiving interface
7-1.3.8 Independent path
7-1.3.9 Poll
7-1.4 MARKING
8-SECTION 2 ALARM TRANSMISSION EQUIPMENT
8-2.1 EQUIPMENT REQUIREMENTS
8-2.1.1 Power supply
8-2.1.2 Access
8-2.2 INSTALLATION REQUIREMENTS
8-2.2.1 Alarm transmission system interface (clients premises)
8-2.2.2 Electrical supply
8-2.2.3 Alarm transmission equipment
8-2.2.4 Final alarm-receiving interface
8-2.2.5 Installation
8-2.3 DOCUMENTATION
9-2.4 TEST REPORT
10-SECTION 3 ALARM TRANSMISSION SYSTEM REQUIREMENTS
10-3.1 GENERAL
11-3.2 ALARM TRANSMISSION SYSTEM MODE
12-3.3 ALARM TRANSMISSION SYSTEM(S) SHARING INFRASTRUCTURE WITH OTHER SYSTEMS
12-3.4 TRANSMISSION TIME
13-3.5 ALARM SYSTEM INTERCONNECTION SUPERVISION
13-3.5.1 Interconnection with the alarm system
13-3.5.2 Alarm system Class C3
13-3.5.3 Alarm system Class C4
13-3.5.4 Alarm system Class C5
13-3.6 TRANSMISSION SYSTEM SUPERVISION
13-3.7 TRANSMISSION SYSTEM AVAILABILITY
13-3.7.1 General
14-3.7.2 Alarm transmission system availability
14-3.7.3 Minimum availability requirement
14-3.7.4 Transmission system management
15-3.7.5 Multiple independent paths
15-3.8 SIGNALLING SECURITY
15-3.8.1 General
15-3.8.2 Classification
16-3.9 FAULT AND MAINTENANCE LOG
16-3.10 TESTING
17-SECTION 4 ALARM TRANSMISSION SYSTEM TESTS
17-4.1 GENERAL
17-4.2 SYSTEM CONFIGURATION
17-4.3 TRANSMISSION TIME-NORMAL PERFORMANCE TEST
17-4.3.1 Objective of test
17-4.3.2 Test procedure
17-4.3.3 Requirement
17-4.4 TRANSMISSION TIME-RECOVERY FROM OVERLOAD TEST
17-4.4.1 Objective of test
18-4.4.2 Test procedure
18-4.4.3 Requirement
18-4.5 TRANSMISSION TIME-PEAK LOAD TEST
18-4.5.1 Objective of test
18-4.5.2 Test procedure
18-4.5.3 Requirement
18-4.6 ALARM SYSTEM INTERCONNECTION SUPERVISION TEST-CATEGORIES T1 AND T2
18-4.6.1 Objective of test
19-4.6.2 Test procedure
19-4.6.3 Requirements
19-4.7 ALARM SYSTEM INTERCONNECTION SUPERVISION TEST-CATEGORY T3
19-4.7.1 Objective of test
19-4.7.2 Test procedure
20-4.7.3 Requirements
20-4.8 ALARM SYSTEM INTERCONNECTION SUPERVISION TEST-CATEGORY T4
20-4.8.1 Objective of test
20-4.8.2 Test procedure
21-4.8.3 Requirement
21-4.9 ALARM SYSTEM INTERCONNECTION SUPERVISION TEST-CATEGORY T5
21-4.9.1 Objective of test
21-4.9.2 Test procedure
21-4.9.3 Requirement
21-4.10 ALARM TRANSMISSION SYSTEM SUPERVISION TEST-CATEGORY T1
21-4.10.1 Objective of test
21-4.10.2 Test procedure
22-4.10.3 Requirements
22-4.11 ALARM TRANSMISSION SYSTEM SUPERVISION TEST-CATEGORY T2
22-4.11.1 Objective of test
22-4.11.2 Test procedure
22-4.11.3 Requirements
23-4.12 ALARM TRANSMISSION SYSTEM SUPERVISION TEST-CATEGORIES T3, T4 AND T5
23-4.12.1 Objective of test
23-4.12.2 Test procedure
23-4.12.3 Requirement
23-4.13 TRANSMISSION SYSTEM AVAILABILITY TEST
23-4.13.1 Objective of test
23-4.13.2 Test procedure
23-4.13.3 Requirement
23-4.14 SIGNAL SECURITY-CATEGORY S1
23-4.14.1 Objective of test
24-4.14.2 Test procedure
24-4.14.3 Requirement
24-4.15 SIGNAL SECURITY-CATEGORY S2
24-4.15.1 Objective of test
24-4.15.2 Test procedure
24-4.15.3 Requirements
24-4.16 SIGNAL SECURITY-CATEGORY S3
24-4.16.1 Objective of test
24-4.16.2 Test procedure
25-4.16.3 Requirements
25-4.17 SIGNAL SECURITY-CATEGORY S4
25-4.17.1 Objective of test
25-4.17.2 Test procedure
25-4.17.3 Requirements
26-4.18 SIGNAL SECURITY-CATEGORY S5
26-4.18.1 Objective of test
26-4.18.2 Test procedure
26-4.18.3 Requirement
26-4.18.4 Manufacturers validation