• -78%
  • New
AS/NZS 1516:1994
search
  • AS/NZS 1516:1994

AS/NZS 1516:1994

$72.72
$16.00 Save 78%

AS/NZS 1516:1994 The cement mortar lining of pipelines in situ (Reconfirmed 2020)

Quantity

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

1-AS/ NZS 1516:1994 THE CEMENT MORTAR LINING OF PIPELINES IN SITU
4-PREFACE
5-CONTENTS
6-1 SCOPE
6-2 REFERENCED DOCUMENTS
7-3 DEFINITIONS
7-3.1 Admixture
7-3.2 Curing
7-3.3 Fitting
7-3.4 Internal diameter
7-3.5 Laitance
7-3.6 Lining
7-3.7 Mortar
7-3.8 Seal coat
7-3.9 Spray application
7-4 MATERIALS
7-4.1 Aggregates
7-4.2 Cement
7-4.3 Water
8-4.4 Admixtures
8-4.5 Cement mortar
8-5 PROPORTIONING OF MATERIALS
8-5.1 Aggregate:cement ratio
8-5.2 Water: cement ratio
8-6 MEASUREMENT AND MIXING OF MATERIALS
8-7 PREPARATION OF PIPELINE SURFACES
8-8 APPLICATION OF MORTAR
8-8.1 General
8-8.2 Spray application
8-8.3 Hand application
8-9 TYPE TESTING HAND REPAIR MORTAR
8-9.1 General
9-9.2 Adhesion to steel and cured mortar
9-9.3 Water: cement ratio
9-10 THICKNESS OF LINING
9-11 SURFACE QUALITY AND WORKMANSHIP
9-11.1 General
9-11.2 Defects
10-11.3 Repairs
10-12 CURING
10-13 APPLICATION OF SEAL COAT
11-14 EFFECT OF CEMENT MORTAR LINING ON WATER QUALITY
11-15 INSPECTION
13-APPENDIX A - PURCHASING GUIDELINES
13-A1 GENERAL
13-A2 INFORMATION TO BE SUPPLIED BY THE PURCHASER
13-A3 MATTERS TO BE DECIDED BY AGREEMENT
13-A4 INFORMATION TO BE SUPPLIED BY THE CONTRACTOR
14-APPENDIX B - MEANS FOR DEMONSTRATING COMPLIANCE WITH THIS STANDARD
14-B1 SCOPE
14-B2 STATISTICAL SAMPLING
14-B3 PRODUCT CERTIFICATION
14-B4 SUPPLIERS QUALITY SYSTEM
15-B5 OTHER MEANS OF ASSESSMENT

R00003214
7081 Items
chat Comments (0)
No customer reviews for the moment.