• -78%
  • New
AS/NZS 3666.1:1995
search
  • AS/NZS 3666.1:1995

AS/NZS 3666.1:1995

$126.92
$27.92 Save 78%

AS/NZS 3666.1:1995 Air-handling and water systems of buildings - Microbial control Design, installation and commissioning

Quantity

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

1-AS/NZS 3666.1:1995 AIR-HANDLING AND WATER SYSTEMS OF BUILDINGS - MICROBIAL CONTROL - DESIGN, INSTALLATION AND COMMISSIONING
4-PREFACE
5-CONTENTS
6-FOREWORD
10-SECTION 1 SCOPE AND GENERAL
10-1.1 SCOPE
10-1.2 OBJECTIVE
10-1.3 APPLICATION
11-1.4 REFERENCED DOCUMENTS
12-1.5 DEFINITIONS
12-1.5.1 Aerosol
12-1.5.2 Air filter
12-1.5.3 Air-handling plant
12-1.5.4 Air-handling system
12-1.5.5 Air intake
12-1.5.6 Air outlet
12-1.5.7 Approved and approval
12-1.5.8 Biocide
12-1.5.9 Bleed-off (or Blowdown)
12-1.5.10 Building
12-1.5.11 Clean
12-1.5.12 Cleaning
12-1.5.13 Coil
12-1.5.14 Commissioning
12-1.5.15 Competent person
12-1.5.16 Cooling tower
12-1.5.17 Cooling water system
12-1.5.18 Corrosion resistant
12-1.5.19 Dead-leg
13-1.5.20 Drift
13-1.5.21 Duct
13-1.5.22 Ductwork
13-1.5.23 Evaporative air cooler
13-1.5.24 Evaporative condenser
13-1.5.25 Exhaust outlet
13-1.5.26 Hot water
13-1.5.27 Humidifier
13-1.5.28 Humidifier fever
13-1.5.29 Hypersensitivity pneumonitis
13-1.5.30 Installation
13-1.5.31 Legionnaires disease
13-1.5.32 May
13-1.5.33 Pontiac fever
13-1.5.34 Recirculation
13-1.5.35 Regulatory authority
13-1.5.36 Shall
13-1.5.37 Should
13-1.5.38 Sole occupancy dwelling
13-1.5.39 Terminal unit
13-1.5.40 Warm water
14-SECTION 2 DESIGN, INSTALLATION AND COMMISSIONING OF AIR-HANDLING SYSTEMS
14-2.1 GENERAL
14-2.1.1 Outdoor air
14-2.1.2 Access for maintenance
14-2.1.3 Provision for maintenance
14-2.1.4 Building plans
14-2.2 AIR INTAKES
14-2.2.1 General
14-2.2.2 Location
14-2.3 EXHAUST AIR OUTLETS
14-2.3.1 General
14-2.3.2 Location
14-2.4 AIR FILTERS
15-2.5 HUMIDIFIERS
15-2.5.1 Location
15-2.5.2 Integration of controls
15-2.5.3 Precipitation of moisture
15-2.5.4 Disposal of moisture
15-2.6 EVAPORATIVE AIR COOLERS
15-2.6.1 Materials and construction
15-2.6.2 Location
15-2.6.3 Drains
15-2.7 COILS
15-2.7.1 General
15-2.7.2 Disposal of condensate
15-2.8 TRAYS AND SUMPS
15-2.8.1 General
16-2.8.2 Materials and construction
16-2.8.3 Collection of condensate and water
16-2.9 CONDENSATE AND EQUIPMENT DRAINAGE
16-2.9.1 General
16-2.9.2 Discharge
16-2.10 FAN ASSEMBLIES
16-2.11 DUCTWORK AND COMPONENTS
16-2.11.1 Design and installation
16-2.11.2 Drainage
16-2.11.3 Access for inspection and cleaning
17-2.12 TERMINAL UNITS
17-2.13 COMMISSIONING
18-SECTION 3 DESIGN, INSTALLATION AND COMMISSIONING OF HEATED WATER SYSTEMS
18-3.1 GENERAL
18-3.1.1 Access for maintenance
18-3.1.2 Provision for maintenance
18-3.1.3 Materials
18-3.1.4 Pumps
18-3.1.5 Water treatment units
18-3.1.6 Water storage tanks
18-3.1.7 Layout
18-3.2 HOT WATER SYSTEMS
18-3.3 WARM WATER ABLUTION SYSTEMS
18-3.4 COMMISSIONING
19-SECTION 4 DESIGN, INSTALLATION AND COMMISSIONING OF COOLING WATER SYSTEMS
19-4.1 GENERAL
19-4.1.1 Access for maintenance
19-4.1.2 Provision for maintenance
19-4.1.3 Water treatment systems
19-4.1.4 Materials
19-4.1.5 Cooling towers
20-4.2 PUMPS
20-4.3 LOCATION
20-4.4 DRIFT CONTROL
20-4.5 CONTROL OF SOLIDS
20-4.6 SUNLIGHT
21-4.7 COMMISSIONING

R00003252
6936 Items
chat Comments (0)
No customer reviews for the moment.